NOx-Related Project List :
Fluid Bed SNCR Optimization -
Confidential Client
Customer was experiencing marginal
environmental compliance, short injector life, and chemical
scaling. The facility requires NOx reduction in the order of
80%. Changes were made to the basic process to eliminate the
chemical scaling, and new injectors were supplied to improve injector
service life and dispersion.
Kauai Power Partners Project
Kauai, Hawaii
Scope: Design and Supply of a Dry
Urea Handling System which creates a urea solution from dry urea. Fully shop prefabricated with PLC controls.
Fabricated, pre-commissioned, and shipped 11 weeks after
Approvals. Commercial operation since mid-'02.
Martell Cogeneration Facility
Martell, CA
Scope: Process Optimization and
equipment upgrades for an existing SNCR system at this 15MW wood fired
unit. Unit demonstrated a detached stack plume from excess ammonia slip.
Included furnace temperature profiling, dual fluid nozzle supply, and an
atomizing air distribution system.
Gloucester County Resource Recovery
Facility Westville, NJ late 200 and early 2001
Scope: Project Engineer and General
Contractor for the installation of an SNCR system and Continuous
Emission Monitoring System upgrade. Included the expansion of the
compressed air system and the supply of dual fluid injection nozzles to
replace the OEM equipment. New nozzles showing much greater service life
and 25-30% lower reagent consumption. Design improvements also expected
to reduce/eliminate localized corrosion to boiler tubes.
South Broward Resource Recovery
Facility Ft Lauderdale, FL mid 2000
Scope: Project Engineer and General
Contractor for the installation of an SNCR system at this 90MW refuse to
energy facility. Design activities: civil, mechanical, electrical,
compressed air addition. Installation activities: bid package
development, contractor selection, and construction management.
North Broward Resource Recovery
Facility Pompano Beach, FL mid 2000
Scope: Same as for South Broward
work nearly identical and executed simultaneously.
Baltimore RESCO Baltimore, MD -
1999
Scope: Lead Project Engineer and
Engineer-of-Record for a large ($40 MM) air pollution control retrofit
project, which included expansion of their existing SNCR system.
Westchester RESCO Peekskill, NY
1998
Scope: Lead Project Engineer and
Engineer-of-Record for a large ($68 MM) air pollution control retrofit
project, including a new SNCR system.
Ridge Generating Station Lakeland,
FL
Scope: Tested generic urea reagents
as a substitute for the more expensive, proprietary, reagent. Test was
successful leading to a similar conversion at 11 other facilities.
Shasta Energy Anderson, CA 1989
Scope: Project Engineer for the
design and installation of an SNCR system at this 60MW wood fired plant.
Wheelabrator Millbury Millbury, MA
1986
Scope: Project Engineer for the
design, installation, and testing of an SNCR system at this 45MW refuse
to energy facility. This was a temporary demo project to test the
performance of the system prior to installation elsewhere with
commercial and regulatory guarantees. This was the first installation at
a large municipal waste-to-energy facility in the US.
About DNT's Principal :
David Wojichowski, Principal and
Project Manager of DNT, is a foremost expert on the design,
installation, and operation of Selective Non-Catalytic Reduction (SNCR)
techniques. This unique combination of sound technical understanding and
real-world commercial experience is now being made available to the
electric power and industrial boiler markets through De-NOX Technologies.
David's experience as Project Manager
included the responsibility for the design and installation of urea and
ammonia-based SNCR systems at
seven small power generation facilities including the very first in
the USA on a Municipal Solid Waste to- Energy facility.
Credentials
· Bachelor
of Science in Chemical Engineering, Michigan State University
· Master
of Business Administration, University of Houston
· Registered
Professional Engineer in PA, NY, MD, FL, and NJ.
Affiliates
See our affiliates page for key
DNT relationships.
·