[Home]
[SNCR] [Dry
Urea] [Ammonia Gen]
[FAQ]
[NOx Optimization] [Publications]
Recent Developments
at De-NOx Technologies
2011 Projects:
·
Design/Supply
Ammonia SNCR for 2 x 250,000 pph wood fired boiler in VA
·
Design/Supply
Urea SNCR for 160,000 pph wood fired boiler in CA
2010 Projects:
·
Design/Supply
Ammonia SNCR for 225,000pph wood fired boiler in WA
·
Design/Supply
Ammonia SNCR for 3000TPD Midwest Cement Plant
·
Design/Supply Urea SNCR System for 80 tph pulverized coal
boiler
·
Design/Supply Urea SNCR System for 200,000 pph biomass boiler
in OR
·
SNCR Demonstration at a 350,000 pph wood fired boiler in FL
2009 Projects:
·
Design/Supply Ammonia SNCR System for 2 x 25MW wood fired
boilers in
·
Design/Supply Urea SNCR System for Refuse/Sludge BFB boiler
in
·
Design/Supply Ammonia SNCR system for 4000 TPD Cement Plant
near Austin TX
2008 Projects:
·
Design/Supply Urea SNCR system for 50 MW wood fired boiler in
·
Design/Supply 25 MW stoker-fired coal boiler Urea SNCR in
·
Design/Supply 30 MW pulverized coal boiler SNCR in
·
Cement Plant SNCR Demos #11 and #12.
·
Design/Supply SNCR system for 4000 TPD Cement Plant in
2007 Projects:
·
Design/Supply two small wood-boiler urea SNCR systems at two
different sites.
·
One urea SNCR system at biomass/sludge boiler for a SD
ethanol plant.
·
Cement Plant Demo #10
·
Design/Supply Urea Dissolving System, Hawaii Electric Co
·
Design/Supply Urea based SNCR system with automatic
multi-zone injector controls for a 225 tph load-following hog fuel boiler.
2006 Projects:
·
SNCR Demos on three North American cement manufacturing
facilities (two preheater types, one preheater/precalciner, both urea and
ammonia) leading to contract for design/supply for permanent equipment at
one which has been delivered, installed, and is operational.
·
SNCR Design/Supply
Urea SNCR systems for three wood fired boilers at three different sites.
·
Design/Supply Urea SNCR systems for two identical biomass
fired boilers at two different sites. Includes
multi-zone automatic injector controls.
PRE2006 PROJECTS:
·
Cement SNCR Four Demonstrations and two
Design/Supply/Guarantee Contracts.
·
Design/Supply Ammonia SNCR for a 50MW coal/sludge CFB
·
Design/Supply/Guarantee Urea SNCR system for a 20MW MSW
Incinerator in CT
·
OEM Urea Injector Replacements at 2 MSW and 2 Biomass
facilities Maint Cost and Reagent Reduction.
·
Design/ Supply Urea Dissolving System
·
SNCR Field Installation Manager 3 MSW Incineration
Facilities
·
Urea SNCR Retrofits 2
large MSW-Incinerators
·
Ammonia SNCR Retrofit on a 60 MW wood fired facility.
·
First SNCR installation at any
.
The qualifications are there . . . Why spend more on a system than necessary ?