[Home]    [SNCR]    [Dry Urea]    [Ammonia Gen]    [FAQ]   
 [NOx Optimization] [Publications]

   Recent Developments at De-NOx Technologies

 

 

 

 

 

2011 Projects:

·         Design/Supply Ammonia SNCR for 2 x 250,000 pph wood fired boiler in VA
·        
Design/Supply Urea SNCR for 160,000 pph wood fired boiler in CA

2010 Projects:

·         Design/Supply Ammonia SNCR for 225,000pph wood fired boiler in WA
·        
Design/Supply Ammonia SNCR for 3000TPD Midwest Cement Plant
·         Design/Supply Urea SNCR System for 80 tph pulverized coal boiler
·        
Design/Supply Urea SNCR System for 200,000 pph biomass boiler in OR
·        
SNCR Demonstration at a 350,000 pph wood fired boiler in FL  

2009 Projects:
·        
Design/Supply Ammonia SNCR System for 2 x 25MW wood fired boilers in WI
·        
Design/Supply Urea SNCR System for Refuse/Sludge BFB boiler in AUS
·        
Design/Supply Ammonia SNCR system for 4000 TPD Cement Plant near Austin TX  

2008 Projects:
·        
Design/Supply Urea SNCR system for 50 MW wood fired boiler in East TX .
·        
Design/Supply 25 MW stoker-fired coal boiler Urea SNCR in Kansas .
·        
Design/Supply 30 MW pulverized coal boiler SNCR in Korea .  Start-up March 2009.
·        
Cement Plant SNCR Demos #11 and #12.
·        
Design/Supply SNCR system for 4000 TPD Cement Plant in Toronto area.  

2007 Projects:
·        
Design/Supply two small wood-boiler urea SNCR systems at two different sites.
·        
One urea SNCR system at biomass/sludge boiler for a SD ethanol plant.
·        
Cement Plant Demo #10
·        
Design/Supply Urea Dissolving System, Hawaii Electric Co
·        
Design/Supply Urea based SNCR system with automatic multi-zone injector controls for a 225 tph load-following hog fuel boiler.  

2006 Projects:
·        
SNCR Demos on three North American cement manufacturing facilities (two preheater types, one preheater/precalciner, both urea and ammonia) – leading to contract for design/supply for permanent equipment at one – which has been delivered, installed, and is operational.
·        
SNCR  Design/Supply Urea SNCR systems for three wood fired boilers at three different sites.
·        
Design/Supply Urea SNCR systems for two identical biomass fired boilers at two different sites.  Includes multi-zone automatic injector controls.  

PRE–2006 PROJECTS:
·        
Cement SNCR – Four Demonstrations and two Design/Supply/Guarantee Contracts.
·        
Design/Supply Ammonia SNCR for a 50MW coal/sludge CFB
·        
Design/Supply/Guarantee Urea SNCR system for a 20MW MSW Incinerator in CT
·        
OEM Urea Injector Replacements at 2 MSW and 2 Biomass facilities – Maint Cost and Reagent Reduction.
·        
Design/ Supply Urea Dissolving System
·        
SNCR Field Installation Manager – 3 MSW Incineration Facilities
·        
Urea SNCR Retrofits  2 large MSW-Incinerators
·        
Ammonia SNCR Retrofit on a 60 MW wood fired facility.
·        
First SNCR installation at any USA incinerator - Design/Supply/Testing Urea SNCR system 45MW MSW Incinerator in MA.

                       

 

.

 

The qualifications are there . . . Why spend more on a system than necessary ?